Constructive building solutions

Constructive building solutions

ABC Channel 28

Constructive building solutions

ABC Channel 28

The Perry Company was selected by E. W. Scripps Company for a 2,500 sf interior build out. The design studio includes an open ceiling and walls that double as dry erase boards.

E.W. Scripps Company
Ai Collaborative, Inc.
Tampa, Florida